检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《油气井测试》2007年第z1期15-18,共4页Well Testing
摘 要:低产、低渗油田注水开发过程中,注水井修井作业放喷降压会造成地层压力下降、水资源浪费、污染环境等问题。注水井不泄压修井作业技术解决了注水井注水层段调整、更换管柱及配件等一系列井下作业施工难题。该技术既实现注水井作业小修不泄压作业,又能进行大修解卡、打捞、套铣、磨铣、贴补等工艺,对注水开发油田提供了更好的技术支持。During developing process for low production and low percolation oilfields, open down pressure of work-over operation for water injection well causes problems of formation pressure being down, waste of water resource and environmental pollution. Tech of work-over operation without pressure leakage resolves series problems of adjustment of water injection section, changing producing string and repairs parts. It not only realizes no pressure relief for small size work-over operation, but also conducts procedures of unstuck, fishing, washover, milling and patch which is a technical support for development of water injection oilfield.
分 类 号:TE27[石油与天然气工程—油气井工程] P631.81[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222