装甲车辆计划预防工作时机及范围的确定  被引量:1

The Confirm for The Opportunity and Scope of The Armored Vehicle’s Planned Preventative Task

在线阅读下载全文

作  者:陈春良[1] 赵天彪[1] 高连华[1] 

机构地区:[1]装甲兵工程学院技术保障工程系,北京100072

出  处:《装甲兵工程学院学报》2003年第2期50-52,共3页Journal of Academy of Armored Force Engineering

摘  要:利用装甲车辆使用中的可靠性统计数据,确定装置(构件)计划预防工作时机的方法,论述了从单一装置(构件)的计划预防工作,向整车的计划预防工作转化时装甲车辆计划预防时机及范围的确定原则,对装甲车辆部署初期的保养间隔期和修理间隔期的确定或修订具有理论及实践上的指导意义;给出了根据装置(构件)技术状态检测结果,独立确定装置(构件)计划预防工作时机的方法、实例以及需要解决的关键技术问题.In this paper, we gave a method which confirmed the opportunity for the planned preventative task of the equipments (components) by using the operational reliability statistical data of the armored vehicle. And discussed the principle that confirmed the opportunity and scope for the planned preventative task of the armored vehicle when the planned preventative task of a single equipment (components) transformed into the whole armored vehicle's. It had directional meanings in theory and practice for confirming or emending the echelon maintenance interval time and the repair interval time in initial stages. And gave the method, examples and the key technical problems that need to be settled, which can confirm the opportunity for the planned preventative task independently by the detected technical results of the equipments (components).

关 键 词:装甲车辆 计划预防工作 时机确定 

分 类 号:E923[军事—军事装备学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象