济钢6#高炉停开炉操作  

Blowing-out and Blowing-in Operation of No.6 Blast Furnace at Jigang

在线阅读下载全文

作  者:徐京义[1] 王连杰[1] 程克友[1] 

机构地区:[1]济南钢铁集团总公司,山东济南250101

出  处:《山东冶金》2002年第6期9-11,共3页Shandong Metallurgy

摘  要:济钢 6#高炉在炉底侵蚀严重、炉墙结厚的情况下 ,通过优化方案、强化施工网络管理等措施 ,使大修改造工期仅用3 8天 ;在一次开炉成功并迅速达产后 ,当月实现利用系数 3 .12 t/ m3.d,主要技术经济指标创济钢 3 5 0 m3高炉开炉最好历史水平。On the condition of serious bottom erosion and the wall accretion of No.6 BF at Jigang, with the measures of optimizing the plan and intensifying the constructing network management, the time limit for a project of major repair reconstruction is only 38 days. And after blowing in on its first test run being successful and becoming normal, the utilization coefficient of the first month has reached 3.12t/m\+3.d and the main technical and economic indexes run the best in blowing in history of 350m\+3 BF at Jigang.

关 键 词:高炉 大修 停炉 开炉 

分 类 号:TF548[冶金工程—钢铁冶金] TF541

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象