检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]济南钢铁集团总公司技术中心,山东济南250101
出 处:《山东冶金》2002年第z1期79-81,共3页Shandong Metallurgy
摘 要:济钢 4#高炉中修集中安装三段 (84块 )铸钢冷却壁后 ,因铸钢冷却壁冷却强度大 ,易造成炉墙结厚 ,通过采用控制合适的水流量及水温差、相应的装料制度、热制度、送风制度及上下调剂的操作制度 。Three parts (84 pieces) of cast steel cooling staves are installed centrally during the intermediate relining of No.4 BF at Jigang, then the effect of cast steel stave on furnace operation is analyzed. It is pointed out that the cast steel cooling stave's great cooling intensity results in BF wall accretion easily. Through controlling the appropriate water flow and water temperature difference, the related charging system, thermal system, blast system and operation system of top and bottom adjusting, the BF can get high efficiency, smooth operation and long campaign.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.236.97