检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何宏谋[1] 杨丽丰[1] 张永[1] 张孝亲[2]
机构地区:[1]黄河水利委员会勘测规划设计研究院,河南郑州450003 [2]黄河水利委员会黄河上中游管理局,陕西西安710043
出 处:《海岸工程》2001年第3期39-42,共4页Coastal Engineering
摘 要:通过对黄河河口河段淤积形成机理的分析 ,认为黄河河口治理的关键是有效地控制河口侵蚀基准面的抬高 ,这也是衡量任何一种治理措施优劣的标准。在此基础上提出了利用浮动泵站来实现控制河口侵蚀基准面抬高的工程措施 ,并结合河口地区的地形条件和工程条件 ,初步提出了工程总体布置的初步设想。Based on the analysis of aggradation formation mechanism in the Yellow River estuarine reaches, it is considered that the effective control of the rise of estuarine erosion base level is the key for regulating the Yellow River mouth and the criterion to judge whether a kind of regulating measures is good. Therefore, it is suggested to use the floating pump station to control the rise of estuarine erosion base level, and the tentative ideas for the general layout of regulating engineerings are proposed according to the topographic and engineering conditions in the estuarine area.
分 类 号:TV856[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.154