检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:屈龙[1] 秦建甫[1] 侯清波[1] 符新阁[1]
机构地区:[1]黄河勘测规划设计有限公司地质工程院,河南郑州450003
出 处:《中国煤炭地质》2006年第6期33-37,共5页Coal Geology of China
摘 要:通过对地处青藏高原腹地,南水北调西线工程杜柯河安达坝址区工程地质条件的初步调查与研究,对坝区稳定、岸坡稳定、坝基稳定、坝基渗漏和河床覆盖层等主要工程地质问题进行了分析,并作出了阶段性结论:①坝段处于稳定区,坝段内水质较好,未发现水平或缓倾角的软弱结构面,可以满足混凝土面板堆石坝的建坝要求;②受F1、F2断层的影响,右岸岸坡稳定条件好于左岸;③坝基可能存在沿背斜核部、左坝肩断层破碎带集中渗漏问题及绕坝渗漏问题。Through a pilot investigation and study on Do Qu River Gamda dam site(a part of west route project of south-to-north water diversion) engineering geological condition,the dam is located on hinterland of the Qinghai-Tibet Plateau.Ana-lyzed main engineering geological problems such as dam area,bank slope,dam foundation stability,dam foundation leakage and riverbed covering,then worked out preliminary conclusion: ①dam site is located on a stable region,water quality is rather good,no horizontal or gently dipping weak structural plane has been found,can meet the requirement of a rock-fill dam covered by concrete plates;②as influencing from faults F1 and F2,stability of the right bank slope is better than the left bank;③dam foundation may exist piping and abutment leakages along the anticline core and left abutment shattered fault zone.
关 键 词:工程地质调查 坝基 岸坡 渗漏 稳定 安达坝址区
分 类 号:P642[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31