检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王元强
机构地区:[1]广东省粤泷发电有限责任公司,罗定527217
出 处:《发电设备》2009年第6期400-401,406,共3页Power Equipment
摘 要:针对电站锅炉炉膛中容易产生爆燃而引发灭火事故,而灭火保护动作延时时间过短又会引发锅炉假灭火停炉事故,因而从理论和实践两方面对锅炉爆燃后炉膛压力的变化进行了探讨,从而恰当地设定灭火保护最佳延时时间,既保证了锅炉的安全运行,又防止了假灭火导致停炉的事故。Flameout failures resulting from explosive burning in boiler furnace frequently happen in power plants.In order to prevent false flameout failures caused by too short delay time of flameout protection,which may bring about emergency shutdown of the boiler,a study was made,from both theoretical and practical aspects,on the pressure variation in the furnace after deflagration had happened,and hence an optimum delay time obtained,with which safety boiler operation guaranteed and unnecessary boiler shutdown cau...
分 类 号:TK227[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15