贵州电网梯级水电站群联合调度运行方式研究  被引量:5

Study of Joint Dispatching Operation Mode in Cascaded Hydroelectric Stations of Guizhou Power Grid

在线阅读下载全文

作  者:苏华英[1] 孙斌[1] 林成[1] 程春田[2] 

机构地区:[1]贵州电力调度通信局,贵州贵阳550002 [2]大连理工大学水电与水信息研究所,辽宁大连116024

出  处:《水电能源科学》2010年第6期115-117,共3页Water Resources and Power

基  金:国家自然科学基金项目(50679011);高校博士点基金资助项目(20050141008)

摘  要:基于传统电站调度图,构建了系统蓄能与系统总出力的关系,以贵州电网梯级水电站群历史流量数据为例,并分别以多年平均发电量最大、系统不蓄能期望最大为优化调度方式、负荷优化分配对调度规则各变量进行整体寻优,获得了水电站群联合调度方式。检验结果表明,该运行方式可确保电网和水电系统安全高效运行,可供借鉴。Based on traditional operation chart of power plant,the relationship between total energy storage and output in power system is set up.Taking the historical runoff data of cascaded hydroelectric stations in Guizhou Power Grid for an example,the joint dispatching operation mode of cascade hydropower stations are obtained by using the maximum annual average generating capacity and the maximum system energy storage as the optimization goals and optimizing variables for dispatching rules.The results show that t...

关 键 词:电力系统 水电站群 运行方式 负荷分配方法 调度图 

分 类 号:TV737[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象