检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:巢斯[1] 王磊[2] 雷小虎[2] 张金[2] 刘伟伟[2]
机构地区:[1]同济大学建筑研究设计院,上海200092 [2]同济大学建筑工程系,上海200092
出 处:《结构工程师》2009年第5期88-92,共5页Structural Engineers
摘 要:大型深基坑的基坑回弹引起的桩拉力不容忽视,工程界就发生过工程桩被拉断的案例。由于现行规范中没有相关基坑回弹引起桩拉力计算设计的规定,基坑回弹引起桩拉力的设计缺少可靠的依据。结合《建筑地基基础设计规范》(GB 50007—2002)中基坑回弹的计算方法、工程实例以及ABAQUS有限元软件,对基坑回弹和基坑回弹引起桩拉力进行了分析、探讨。考虑了基坑开挖面积、深度、工程桩的桩长、桩径和桩距等影响因素,提出了基坑回弹引起桩拉力的经验计算方法。The tensile force of piles caused by subsoil rebound of large and deep pile foundation can not be ignored, the cases have been found that the piles were pulled off in projects. As there is no normative criterion of design and calculation about tensile force of piles caused by subsoil rebound, civil engineers lack reliable basis to make a design about it. In this paper, the method about calculation of subsoil rebound in Building Foundation Design Code (GB 50007—2002 ), project examples and finite element sof...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145