750kV电网形成初期对青海电网影响  被引量:5

Studies on Influences of the 750 kV Grid at Its Initial Stage on Qinghai Power Grid

在线阅读下载全文

作  者:董凌[1] 王亦婷 成静[1] 

机构地区:[1]青海省电力公司,西宁810008

出  处:《电网与清洁能源》2010年第5期30-34,共5页Power System and Clean Energy

摘  要:随着青海750kV电网的建成投运,青海将出现750/330kV电磁环网。研究了青海750kV网架初步形成后,750/330kV电磁环网运行方式对系统安全稳定性的影响。静态安全分析和稳定计算结果表明,在未形成坚强的750kV网架结构前,合环运行比解环方式更有利于提高甘青电网输送能力。With completion and putting into operation of the 750 kV Qinghai power grid,the original 330 kV grid will be electro-magnetically coupled with the newly built 750 kV power grid.This paper studies the influences of operation modes of the electro-magnetically coupled 750/330 kV power grid on the system security and stability after Qinghai 750 kV main grid is preliminarily formed at the end of 2009.The results ofboth the static security and stability analyses show that before a strong 750 kV network is built u...

关 键 词:青海750kV电网 电力系统 运行方式 电磁环网 输送极限 潮流计算 

分 类 号:TM711[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象