机构地区:[1]国家电力公司贵阳勘测设计研究院,贵州贵阳550002
出 处:《贵州水力发电》2003年第3期30-33,共4页Guizhou Water Power
摘 要:洪家渡水电站面板堆石坝处于高山峡谷岩溶地区,坝高179 5m,河床宽高比2 38。在坝基开挖设计中,通过认真研究趾板区的地形地质条件,将趾板上部高边坡、趾板基础及趾板下游的堆石体边坡开挖统筹考虑,一次开挖完成。在坝基处理中,根据开挖揭露的多种不良地表形态和地质缺陷,制定了相应措施,满足了工程要求。这些设计方法和处理措施将为岩溶峡谷地区修建面板堆石坝积累有益的经验。The face rockfill dam of Hongjiadu Hydropower Station with a height of 1795 m and ratio of width to height 238 located at karst area where are high mountains and gorges.When dam foundation excavation was designed, conscientiously researching topographic and geological conditions, the designer selected the design that high side above plinth, plinth foundation and the side of rockfill body at downstream of plinth would be excavated at same time. When dam foundation was treated the designers adopted relevant measures to meet the requirements of engineering according to many unfavorable topographic and geological conditions discovered in excavation.The design method and treatment measures have accumulated helpful experience for constructing face rockfill dam in karst gorge areas.
关 键 词:水利工程施工 基础开挖 处理设计 洪家渡水电站面板堆石坝
分 类 号:TV223.3[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.94