检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国家电力公司贵阳勘测设计研究院,贵州贵阳550002
出 处:《贵州水力发电》2003年第3期38-41,共4页Guizhou Water Power
摘 要:洪家渡水电站建设过程中,在充分试验和研究的基础上,对引进和消化新技术、新材料做了大胆的探索和尝试,用以解决了多项工程技术难题,使工程建设质量更好、进度更快、投资更省。本文就洪家渡工程大坝、隧洞、厂房设计及施工采用等宽连续窄趾板、冲碾压实技术、厂房新型结构、中空自钻式锚杆、纤维混凝土、塑料盲沟材等新技术、新材料的应用情况进行介绍,以供同行参考。In order to make the engineering construction quality better, speed quicker and cost more economic, on the base of full test and research, some new technologies and new materials have boldly been introduced and applied to solve some engineering technology difficult problems during construction period of Hongjiadu Hydropower Station. The paper introduces some adopted new technologies and new materials in design of dam, tunnels and powerhouse as well as construction for conference, for example equalwidth continuous narrow plinths, punching compaction technology, newtype structure of powerhouse, hollow drillingself anchor bar, fiber concrete, plastic catch drain material and etc.
关 键 词:水工材料 新技术、新材料 应用情况 洪家渡水电站
分 类 号:TV4[水利工程—水工结构工程] TV52
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.66