新技术、新材料在洪家渡工程中的应用  被引量:6

Application of New Technologies and New Materials in Hongjiadu Engineering Project

在线阅读下载全文

作  者:杨泽艳[1] 冉懋鸽[1] 文亚豪[1] 

机构地区:[1]国家电力公司贵阳勘测设计研究院,贵州贵阳550002

出  处:《贵州水力发电》2003年第3期38-41,共4页Guizhou Water Power

摘  要:洪家渡水电站建设过程中,在充分试验和研究的基础上,对引进和消化新技术、新材料做了大胆的探索和尝试,用以解决了多项工程技术难题,使工程建设质量更好、进度更快、投资更省。本文就洪家渡工程大坝、隧洞、厂房设计及施工采用等宽连续窄趾板、冲碾压实技术、厂房新型结构、中空自钻式锚杆、纤维混凝土、塑料盲沟材等新技术、新材料的应用情况进行介绍,以供同行参考。In order to make the engineering construction quality better, speed quicker and cost more economic, on the base of full test and research, some new technologies and new materials have boldly been introduced and applied to solve some engineering technology difficult problems during construction period of Hongjiadu Hydropower Station. The paper introduces some adopted new technologies and new materials in design of dam, tunnels and powerhouse as well as construction for conference, for example equalwidth continuous narrow plinths, punching compaction technology, newtype structure of powerhouse, hollow drillingself anchor bar, fiber concrete, plastic catch drain material and etc.

关 键 词:水工材料 新技术、新材料 应用情况 洪家渡水电站 

分 类 号:TV4[水利工程—水工结构工程] TV52

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象