检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华中科技大学水电与数字化工程学院,湖北武汉430074
出 处:《湖北水力发电》2003年第4期48-50,62,共4页Hubei Water Power
基 金:国家重大科技项目(攻关)计划
摘 要:三峡和葛洲坝构成的梯级水电厂根据不同的要求需要构造不同的优化调度模型。讨论在给定葛洲坝一天下泄流量过程的情况下三峡梯级电站发电站发电的情况。使用增量动态规划算法建立日运行模型并用VC程序实现,并用实例计算验证算法的可靠性和高效性。The Three Gorges cascade has two hydropower stations at present, they are Three Gorges power station and Gezhouba power station. According to their different needs, unlike optimum operation models for each power station are worked out, the operating duty of Three Gorges power station is studied under the daily discharge condition of Gezhouba power station. Using incremental dynamic progremming method, the daily operating model of Three Gorges power station is worked out, and carried out by VC programme, the real example shows that this method has good reliability and high efficiency.
分 类 号:TV7[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3