检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《Journal of Donghua University(English Edition)》2002年第3期13-18,共6页东华大学学报(英文版)
基 金:China 86 3Project,ItemNo.:2 0 0 1AA412 2 5 0
摘 要:A new algorithm is proposed for the flexible manufacturing system (FMS) scheduling problem in this paper. The proposed algorithm is a heuristic based on filtered beam search. It considers the machines and automated guided vehicle (AGV) as the primary resources. It utilizes system constraints and related manufacturing and processing information to generate machines and AGV schedules. The generated schedules can be an entire scheduling horizon as well as various lengths of scheduling periods. The proposed algorithm is also compared with other well-known dispatching rules-based FMS scheduling. The results indicate that the beam search algorithm is a simple, valid and promising algorithm that deserves further research in FMS scheduling field.A new algorithm is proposed for the flexible manufacturing system (FMS) scheduling problem in this paper. The proposed algorithm is a heuristic based on filtered beam search. It considers the machines and automated guided vehicle (AGV) as the primary resources. It utilizes system constraints and related manufacturing and processing information to generate machines and AGV schedules. The generated schedules can be an entire scheduling horizon as well as various lengths of scheduling periods. The proposed algorithm is also compared with other well-known dispatching rules-based FMS scheduling. The results indicate that the beam search algorithm is a simple, valid and promising algorithm that deserves further research in FMS scheduling field.
关 键 词:FLEXIBLE MANUFACTURING system scheduling BEAM search algorithm.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249