检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁大桥局集团桥科院有限公司,湖北武汉430034
出 处:《世界桥梁》2010年第3期70-73,共4页World Bridges
摘 要:以连续梁受力与支座标高调整的关系为指导,对包含预拱度制作线形的钢箱梁顶推过程中可能出现的支座脱空问题进行研究。以主梁不动、改变临时墩支撑位置的方法模拟钢箱梁的顶推,程序自动判断支座顶与无应力状态下钢箱梁底板的距离,分别采用接触单元法和强制位移法模拟临时墩的支撑;比较而言,强制位移法计算速度快,为临时墩支座标高的优化所需要的大量计算提供了快速的算法。据此采用ANSYS程序的APDL语言,对某桥钢箱梁的顶推过程临时墩支座标高调整进行了模拟计算,得出"预拱度曲线上凸点经过处支座标高上调,反之下调"的基本优化原则,给出了支座标高优化调整方案。Guided by the relationship between the force conditions of continuous girder and the elevation adjustment of bearings,the problem of detaching of bearings from girder that may occur in the incremental launching erection of the steel box girder with manufactured camber alignment is studied.The method of keeping the position of the box girder unchanged and changing the supporting positions of temporary piers is used to simulate the incremental launching erection of the girder and the computer program will aut...
分 类 号:U445.462[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.252.203