检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋木仿[1]
出 处:《长江工程职业技术学院学报》2001年第4期26-29,共4页Journal of Changjiang Institute of Technology
摘 要:通过初步分析认为 ,水布垭电站机组增设最大出力 ,扩大了水轮机稳定运行区域 ,提高了水轮机运行加权平均效率 ,增强了电站的调峰能力。推荐的 46 0MW方案 ,不仅在技术上是可行的 ,而且经济效益明显。建议在工程设计和机电设备招标中考虑机组增设最大出力要求。Through preliminary analysis,it is considered that increasing the maximum output of the generating set in Shuibuya Power Station has expanded the stable operation area of the hydroturbine,promoted the weighted average efficiency,and strengthened the regulating ability of the station.The recommended 460MW scheme is not only technically workable but has clear economic results.It is suggested that increasing the maximum output of the generating set should be taken into consideration in engineering design and the bidding of electromechanical equipment.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195