检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国地质灾害与防治学报》2001年第2期56-58,共3页The Chinese Journal of Geological Hazard and Control
摘 要:滑坡是一种危害极大的地质灾害 ,它的整治方法研究具有重要意义。抗滑桩是一种适应性强、对滑坡稳定性和地质环境干扰小、工期短、抗滑能力强的滑坡整治方法。风动潜孔锤钻进是一种具有许多优点的钻进方法 ,它的许多特点 ,如成孔质量高、应用范围广、无液体循环介质、钻进规程参数小、可实现大直径基岩钻孔等都适合于抗滑桩施工。文章在介绍风动潜孔锤钻进特点的基础上 ,根据抗滑桩施工要求 ,分析了风动潜孔锤用于抗滑桩施工的可行性 ,并举出了其应用实例。Landslide is a geological hazard with serious losses.It is very important to research the controling methods.Slide-resistant pile,which has many advantages such as high adaptability,little interference to landslide and geological environment,short construction time,high silde resistance,is a main method to control landslide.Pneumatic down-the-hole hammer is a drilling method with many advantages.Its features,such as wide application range,high hole quality,no circulating medium,low operation regulations,and drilling big diameter rock hole,fit to construct slide-resistant pile.According to the requirement of silde-resistant pile construction,this paper analyses feasibility that pneumatic DTH hammer drilling applies to construct slide-resistant pile on the basis of introducing the features of pneumatic DTH hammer.Then an applied example is given.
分 类 号:P642.22[天文地球—工程地质学] P634.5[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.74