检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王凤来[1] 陈再现[1,2] 杨刚[1] 刘洧骥[2]
机构地区:[1]哈尔滨工业大学土木工程学院,哈尔滨150090 [2]哈尔滨工业大学(威海)土木工程系,山东威海264209
出 处:《哈尔滨工业大学学报》2009年第12期31-35,共5页Journal of Harbin Institute of Technology
摘 要:为研究双洞口配筋砌块砌体框支墙梁地震前后的受力模式,在拟动力子试验前后进行了底层框架配筋砌块短肢砌体剪力墙结构三层足尺模型的竖向力静载试验.试验结果表明:托梁与上部墙体表现出良好的协同工作能力,其工作模式为拉杆拱.通过对其在拟动力试验前后的受力模式进行了比较,可知带洞口配筋砌块砌体框支墙梁结构体系在墙体受到一定损伤时,并不会使墙梁的受力机理发生明显改变.This paper carried out the vertical static test for both pre-damage and post-damage by the substructure pseudo-dynamic test on the full-scale model which is a three-floor frame-supported reinforced concrete masonry short-leg shear wall structure.The force-transmission mechanism of frame-supported double-hole reinforced concrete masonry was proposed.The testing results show that the good capability to work together is ex-hibited between the joist and upper shear wall,and the working pattern is the tie-arch l...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7