检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《广东土木与建筑》2011年第6期49-51,共3页Guangdong Architecture Civil Engineering
摘 要:以广州市大观路与车陂路系统改善工程中新建下穿东环快速路的隧道为工程背景,分析软弱围岩下浅埋大断面的市政隧道近距离穿越快速路的沉降和隧道围岩收敛情况,其计算结果可为同类工程设计和施工提供一定的理论依据。From the engineering background of a new-built tunnel which crosses under the Guangzhou east gate expressway in the improvement work between the Daguan Road and the Chebei Road,we are about to analyze the subsidence of this shallow tunnel and the convergence of the surrounding rock around it,which is surrounded by weak surrounding rocks and located near the large fracture section.The result of the calculation in this analysis can provide some certain theory evidence to the engineering design and construction of homogeneous engineering works.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145