检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄奕芹
出 处:《广东土木与建筑》2011年第10期19-21,共3页Guangdong Architecture Civil Engineering
摘 要:冲孔灌注桩近年在广东等沿海地区高层建筑和桥梁基础中应用较广泛,但施工过程中常会遇到因混凝土充盈系数偏高而导致工程成本增加、利润降低的问题。文中分析某基础工程施工冲孔灌注桩混凝土充盈系数偏高的原因,探讨其解决对策,及其实施效果和经济、社会效益。The technology of punch filling piles has more widely used in Guangdong and other coastal areas of high-rise buildings and bridge foundation in recent years.But in the process of construction often encountered due to concrete filling coefficient high and leading to increased costs,reduced profit problem.To solve this problem,in this paper,based on the analysis of the basic construction of punch filling piles in the course of concrete filling coefficient increases as the reason,to explore solutions to this problem,and measures the results achieved with the implementation of economic and social benefits.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.227.111.102