机构地区:[1]西南交通大学峨眉校区,四川峨眉山614202
出 处:《铁道标准设计》2012年第8期91-95,共5页Railway Standard Design
摘 要:利用有限差分软件,模拟双洞八车道小净距公路隧道七步台阶法施工过程,分析初期支护随施工步序位移、内力的变化规律。研究表明:隧道初期支护最大压应力主要发生在各部开挖后的拱脚或墙角;最大轴力分布在两洞靠近中间岩柱的边墙和墙角,最大弯矩分布在拱顶;右洞开挖对左洞初期支护轴力影响较小,弯矩影响较大;拱顶位移最大,远离中间岩柱的拱脚和拱腰位移较小。Using the finite difference software,the construction process of the seven steps bench method in twin highway tunnel with eight lanes and small clear-distance was simulated,and the law of the primary support's displacement and internal force varying with construction sequences were analyzed.The results show that the maximum compressive stress of primary support mainly distributes at each of the arch springing or wall corners after each excavation step;the largest axial force distributes at the sidewalls and wall corners close to the middle rock pillar;the maximum bending moment distributes at the vault;the influence of right tunnel excavation on the axial force of left tunnel is smaller than the influence on the bending moment;the displacement of the tunnel vault is the biggest and the displacements of the tunnel arch springing and the hance far from the middle rock pillar are relatively small.
分 类 号:U44[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229