检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]呼和浩特铁路局总工程师室,呼和浩特010010
出 处:《铁道标准设计》2012年第2期26-30,共5页Railway Standard Design
摘 要:京包铁路大包段自开行C80型万吨重载列车以来,轨道设备伤损增加,质量状态显著恶化。通过对定点轨道设备的观测、分析,并结合铁道科学研究院的试验结论,提出大包段轨道设置的参考标准。推荐标准为:优质75kg/m钢轨,R≤1 200 m曲线采用热处理钢轨。轨枕:直线以及R>600 m曲线地段采用Ⅲ型混凝土轨枕,R≤600 m区段采用Ⅳ重载轨枕。扣件:Ⅲ型枕区段采用强化扣件,Ⅳ重载轨枕区段采用配套弹条Ⅵ型扣件,在小半径曲线地段采用弹性轨撑。曲线超高:根据客货均衡速度调整超高,适当减小过超高。Since the 10 000 tons C80-type heavy haul trains run on Datong-Baotou section of Beijing-Baotou Railway,the track facilities are increasingly damaged and their quality status are deteriorated considerably.In this paper,the reference standards for track facilities in this railway section are proposed on the basis of observations and analysis of fixed track facilities and the experimental results presented by China Academy of Railway Sciences.The recommended standards are following: 75 kg/m high quality rails should be adopted,and heat treatment steel rails should be used for R≤1 200 m curve tracks;Ⅲ-type concrete sleepers should be used for straight or R>600 m curve tracks,and Ⅳ-type heavy haul sleepers should be used for R≤600 m curve tracks;enhanced fastenings should be used for Ⅲ-type sleepers,and Ⅵ-type spring clip fastenings should be used for heavy haul sleepers;elastic rail braces should be used for small radius curve tracks;superelevation should be adjusted according to passenger and freight equalization speed and superelevation excess should be reduced properly.
分 类 号:U213.2[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15