检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《铁道标准设计》2012年第4期13-15,20,共4页Railway Standard Design
摘 要:根据重庆市轨道交通6号线大剧院站和江北城站之间的线路实际情况,设计出曲线组合道岔,左侧为对称道岔,右侧为同侧曲线道岔,将2条线路连接起来。详细介绍该曲线道岔的结构设计,并对导曲线半径、夹直线长度、道岔布置、轨底坡超高、曲线加宽、尖轨顶面降低值、道岔转换力各项设计参数进行检算评估,得出结论:当地铁车辆以容许速度通过对称道岔及曲线道岔时,安全性与平稳性均在容许限度内。目前,该道岔已铺设于线路,解决了线路连接问题。In light of the actual situation of Grand Theatre-Jiangbeicheng section in Chongqing Urban Rail Transit Line 6,the combinational curved turnouts were designed with a symmetrical turnout at the left and a same-side curved turnout at the right to connect the two tracks.The structure design of this curved turnouts were introduced in this paper,and relevant design parameters were calculated and evaluated,including the radius of lead curve,length of intermediate straight line,turnout arrangement,slope superelevation of rail base,curve widening,reduction value of top elevation of switch rail,and the switching force of turnout.It is concluded that the safety and stability can meet the requirements of permissible limit when the metro vehicle passes through the symmetrical turnout and the curved turnout at the permissible speed.At present,the combinational curved turnouts have been laid on the section of metro line,so the issue of tracks connection has been resolve.
分 类 号:U213.6[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.11