哈大铁路专线大跨度连续梁施工仿真分析方法与实例  被引量:2

Simulation Analysis and Construction Practice of Large-span Continuous Beam on Harbin-Dalian Passenger Dedicated Line

在线阅读下载全文

作  者:郭景琢 

机构地区:[1]中建哈大铁路客运专线指挥部,辽宁铁岭112000

出  处:《铁道标准设计》2012年第5期96-99,共4页Railway Standard Design

摘  要:在大跨度连续梁施工中,确保桥梁成桥的线形状态符合桥梁设计线形的要求,是保证桥梁处于合理的受力状态、桥梁运营的安全以及桥梁外观线形优美的关键。基于哈大铁路客运专线文官屯(60+100+60)m悬臂施工连续箱梁施工仿真的工程实例,对桥梁施工过程进行仿真分析计算,为确保桥梁线形与应力的合理提供理论计算依据。The proper bridge stress,the safe bridge service and the appealing bridge profile are specifically guaranteed by the appliance of the bridge profile with the design requirements during the construction of large-span continuous beam.This paper,with reference to the engineering practice of the construction simulation of continuous beam with cantilever(60+100+60)m at Wengantun on Harbin-Dalian Passenger Dedicated Line,conducts simulation analysis and calculation for the beam construction process and serves as the basis for theoretical calculation to ensure proper bridge profile and stress.

关 键 词:哈大客运专线 大跨度连续梁 施工仿真 

分 类 号:U238[交通运输工程—道路与铁道工程] U448.21+5[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象