检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中石化中原石油勘探局井下特种作业处,河南濮阳457164
出 处:《内蒙古石油化工》2012年第11期19-20,共2页Inner Mongolia Petrochemical Industry
基 金:国家科技支撑计划项目"低(超低)渗油气田高效增产改造和提高采收率技术与产业化示范"(2007BAB17B03)
摘 要:为解决压后返排支撑剂回流问题,对东北分公司sw 8-9-3井进行了全程纤维加砂施工。现场实验和文献调研证明,纤维可提高压裂液携砂能力,有利于提高支撑缝长,改善裂缝中支撑剂的分布剖面。该井后不关井直接进行压裂液快速返排,排液时间显著缩短,返排效率高。加入纤维可以减缓支撑剂的沉降速度,提高悬砂性能,因此可进一步考虑减少聚合物等增粘剂的加入量,最大限度保护储层,优化导流能力,提高产量。In order to deal with the flowback of proppant,fiber was introduced into the entire stimulation treatment of the well sw8-9-3 in the Northeast Branch of Sinopec.Both field experiment and the document have demonstrated that fiber can enhance proppant carrying capacity of the fracturing fluid,and also increase the propped fracture length and improve the proppant distribution in the fracture.In this well,the fluid began flowback immediately after the treatment without shut-in.In this way,the flowback time has been significantly shorted,but the fluid recovery increased.As the fiber can decrease proppant settling rate and improve the proppant carrying capacity,the polymer can be further reduced,which will facilitate to protect the formation,to improve the conductivity and to enhance the production.
分 类 号:TE3[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40