检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《广东土木与建筑》2012年第2期3-5,44,共4页Guangdong Architecture Civil Engineering
摘 要:大型会展类建筑对使用功能和时间效益的要求与普通民用建筑截然不同,要求结构方案和施工方法不断创新,文中结合广州琶洲跨国采购中心设计过程,重点介绍其采用的新型逆作法技术、预应力型钢混凝土组合结构及超长结构设计的关键技术问题,满足了建筑功能和节约总工期的要求。The requirements of using function and time-effective of the large exhibition buildings are totally different from the ordinary civil buildings,which requires continues innovation on structure sheme and construction methods.This paper illustrates the design process of the Pazhou International Sourcing Center,emphatically introduced the following key technical problems,1) the application of reverse construction method,2) the application of pre-stressed type steel-concrete composite structure and super-long structure.The applications of these key technologies not only meet the function of the building,but also decrease the construction period efficiently.
关 键 词:逆作法施工 预应力型钢混凝土组合结构 超长结构设计
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.125.27