中印输电线路规范风荷载比较  被引量:3

Comparative Study on Wind Loads of Transmission Line between Indian Codes and Chinese Codes

在线阅读下载全文

作  者:曾德森[1] 徐彬[1] 覃伟平[1] 舒爱强[1] 

机构地区:[1]中南电力设计院,湖北武汉430071

出  处:《电网与清洁能源》2012年第7期6-11,18,共7页Power System and Clean Energy

摘  要:面对越来越多的国外工程设计的需求,了解、熟悉并掌握国外规范及其与国内规范的异同,对于在国外工程中更好地采用国外规范进行设计是很有必要的。从实际工程出发,对印度输电线路规范IS 802和中国输电线路规范GB 50545-2010的风荷载计算进行分析和比较。结果表明,中印规范在风荷载重现期、平均时距、风载体型系数、风振系数以及线路和杆塔风荷载计算值上都有些差别。With increasing requirements for designing overseas projects,it is necessary to understand and master foreign engineering codes and differences between those codes and Chinese codes.Based on practical engineering projects,this paper presents a comparative study on the wind load calculations of an overhead transmission line by Indian IS 802 and Chinese GB 50545-2010 for the power transmission line project,respectively.The study suggests that there are some differences in the wind load return period,average wind speed time interval,drag coefficient,and calculated loads on the conductor and steel tower between Indian codes and Chinese codes.

关 键 词:印度规范 输电线路 风荷载 

分 类 号:TM75[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象