检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《广东土木与建筑》2012年第7期3-6,共4页Guangdong Architecture Civil Engineering
摘 要:广州立白大厦基坑工程距地铁隧道最小距离仅20m,其施工是影响区间隧道及地铁车站正常运营的一个重要因素,若施工方案不当或保护措施不足,则很可能引起区间隧道发生过大的不均匀变形。为此建立了该基坑工程的数值分析模型,模拟实际施工工况,动态地分析了施工过程中开挖卸荷对地铁隧道的影响,为优化设计和施工提供了有益的参考。The foundation pit of LiBai Tower in Guangzhou is excavated on adjacent existing metro tunnel.And the minimum distance between the foundation pit and metro tunnel is just 20m.Excavation near the metro is an important factor that affects normal operations of metro station and tunnels.If either the construction plan or protection measures are inappropriate,too much non-uniform deformation may occur.The paper makes a numerical model of the foundation pit project,and simulated the practical construction process and then dynamically analyzes the affection of excavating on metro tunnel.The result provides valuable reference to design and construction.
分 类 号:U451[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117