检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯创业[1] 张增勤[1] 赵志超[1] 韩永涛[2] 王志华[2]
机构地区:[1]河北省地矿局水文工程地质勘查院,河北石家庄050021 [2]石家庄市水务局,河北石家庄050051
出 处:《水文地质工程地质》2013年第3期19-23,共5页Hydrogeology & Engineering Geology
摘 要:为获取滹沱河地下水库入渗场设计所需的参数,在滹沱河河道开展了国内首次大型入渗试验,采用水量平衡原理求取了滹沱河河道的入渗能力。试验成果表明:动水条件下河道入渗能力明显优于静水条件,为增强入渗效果,建议未来建设地下水库进行调蓄时,采用动水条件进行设计;滹沱河河道入渗能力极强,动水条件下稳定入渗能力高达1.31m3(m2.d),为滹沱河地下水库入渗场工程设计提供了重要依据。In order to obtain the parameters required in designing the groundwater reservoir seepage field of the Hutuo River,a first domestic large-scale infiltration test was carried out in the Hutuohe River.Under the balance principle of water volume,the infiltration capacity of the Hutuo River was obtained.The results of the test show that the infiltration capacity of the channel under the hydrodynamic conditions is obviously superior to that under the hydrostatic conditions.To strengthen the infiltration effect,a design under the hydrodynamic conditions is suggested when constructing the underground reservoir for storage in the future.The infiltration capability of the Hutuo River is extremely strong.The steady infiltration capacity can reach 1.31m3/m2·d under the hydrodynamic conditions,which provides an important basis for the engineering design of groundwater reservoir seepage field for the Hutuo River.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.19.120.1