作 者:李飞[1]
机构地区:[1]华能南通电厂,江苏南通226003
出 处:《热力发电》2013年第7期152-153,156,共3页Thermal Power Generation
摘 要:以南通电厂4台350MW机组汽轮机为例,在保证机组检修质量的前提下,采用全实缸结合模拟实缸调整汽轮机汽封间隙,对称调整汽封径向间隙,组装阶段整体微调高、中压缸,将原检修质量标准中缸与转子对中偏差小于0.15mm,修改为机侧缸上抬0.20mm,电侧缸上抬0.40mm。该调整工艺实施后,机组1次冲转成功,大幅缩短了检修工期。Steam seal gap adjustment of turbine is one of the key procedures for turbine maintenance.The gap regulation speed directly affects the unit maintenance duration,and the adjustment results have an immediate influence on the unit economy.Four steam turbines for 350MW units in Nantong Power Plant were taken as the example to conduct the improvement of steam seal gap adjustment,on the premise of ensuring the unit maintenance quality.The concrete upgraded process is:regulating the steam seal gap by fully-installed cylinder tests combined with simulation;adjusting the steam seal radial clearance symmetrically;slightly regulating the high/medium pressure cylinder during assemble stage,changing the original maintenance result that the alignment deviation between cylinder and rotor was less than 0.15mm for that lifting the cylinder at steam turbine side for 0.20mm and that at the generator for 0.40mm.After adjustment,the unit rushed successfully for just one time,and the maintenance duration was dramatically shortened.
关 键 词:350 MW机组 汽轮机 通流 汽封间隙 调整工艺
分 类 号:TK268.+1[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117