塔城110kV电磁环网解环规划研究  

Study on open-loop planning of 110kV electromagnetic ring in Tacheng

在线阅读下载全文

作  者:石连生[1] 赵鹏程[1] 赵洪刚[1] 郑东鸣 

机构地区:[1]天津天大求实电力新技术股份有限公司

出  处:《新疆电力技术》2013年第2期30-33,共4页Xinjiang Electric Power Technology

摘  要:在分析塔城电网220kV/110kV环网运行方式的基础上,结合塔城电网220kV网架发展规划的具体情况,提出了电磁环网解环的方案与时机。运行结果表明,电磁环网解环运行后,简化了网络接线,优化了电网潮流,降低了网络损耗、故障判断和处理的难度,同时又保证了220kV电网的供电能力。According to the parallel operation of 220kV and 110kV in Tacheng Power Grid, the uncoupling loop scheme and the uncoupling time in the future are put forward with consideration of the development of the 220kV power grid. The operation results after breaking up the loop show that it is necessary to break up the electromagnetic loop network in Tacheng to simplify the connection of power grid,optimize the current flow, reduce lines losses, fault judgment and processing difficulty, and guarantee the power supply capacity of 220kV power network.

关 键 词:电磁环网 电磁解环 电网规划 塔城电网 

分 类 号:TM715[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象