检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Li Li
机构地区:[1]School of Advanced Technology,University of Quebec [2]Research Institute on Mines and the Environment (RIME),Department of Civil,Geological and Mining Engineering,Polytechnical School of Montreal
出 处:《International Journal of Mining Science and Technology》2013年第5期763-770,共8页矿业科学技术学报(英文版)
基 金:the financial support of School of Advanced Technology(FIR;PSIRE-research;FDETS);the Natural Sciences and Engineering Research Council of Canada(RGPIN)
摘 要:Backflling represents an environmentally friendly mining waste disposal technique.It is increasingly used in underground mines all over the world.However,its primary purpose remains to improve ground stability and to reduce ore dilution.Previous investigations have shown that fll drainage plays a key role in backfll and barricade design.With a poor drainage system in the backflled stope,the required dimension of barricade,which is constructed at the base of the stope near the drift entrance,has to be increased.A poor backfll drainage system can also lead to a signifcant increase in drainage waiting time and further reduction in mining productivity.In this paper,the drainage of conventional backfll design in backflled stopes is briefly reviewed.For the frst time,the application of the wick drain is introduced in the backfll within mine stopes.The drainage improvement from the introduction of the wick drain is illustrated using numerical modeling.Backflling represents an environmentally friendly mining waste disposal technique.It is increasingly used in underground mines all over the world.However,its primary purpose remains to improve ground stability and to reduce ore dilution.Previous investigations have shown that fll drainage plays a key role in backfll and barricade design.With a poor drainage system in the backflled stope,the required dimension of barricade,which is constructed at the base of the stope near the drift entrance,has to be increased.A poor backfll drainage system can also lead to a signifcant increase in drainage waiting time and further reduction in mining productivity.In this paper,the drainage of conventional backfll design in backflled stopes is briefly reviewed.For the frst time,the application of the wick drain is introduced in the backfll within mine stopes.The drainage improvement from the introduction of the wick drain is illustrated using numerical modeling.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222