检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张守勋[1] 邓科[1] 张舜[1] 胡卡[1] 李佳[1]
机构地区:[1]国网湖北省电力公司检修公司,湖北武汉430050
出 处:《湖北电力》2014年第2期58-60,共3页Hubei Electric Power
摘 要:随着SF6封闭式组合电器(GIS)设备在500kV变电站的广泛投入运行,已发现部分GIS因漏气导致SF6压力降低的现象。本文对湖北省500kV变电站的GIS设备漏气现象进行了调查统计,并以朝阳变电站为例进行试验分析,得出主要原因为外"V"槽密封不完全,失去可靠的防水措施,容易形成贯穿型槽孔而导致漏气。对漏气设备进行注脂工艺改进后,均未发现对接面存在漏气现象。As more and more SF6enclosed switchgears(GIS)equipments put into operation in 500 kV substation,pressure reducing caused by SF6leakage has been detected up to now.This paper investigates the 500kV GIS equipment leakage phenomenon in Hubei province.Taking Chaoyang substation as example,the experimental analysis demonstrates that the main cause of leakage is the outer ' V' groove sealed not completely,which loses the reliable waterproof measures and is easy to form throughout shaped slot caused leakage.After greasing process improvement for the leakage equipment,the docking surface leakage phenomenon is not found.
分 类 号:TM64[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28