检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]复旦大学历史学系,上海200433 [2]复旦大学历史地理研究所,上海200433
出 处:《长江师范学院学报》2014年第2期14-23,138,共11页Journal of Yangtze Normal University
基 金:国家社会科学基金青年项目"明清时期云贵地区的水利建设及其地理基础研究"(12CZS074);教育部人文社会科学青年基金项目"川江与荆江流域水利史研究"(12YJC770041)
摘 要:辛亥革命前一年建设的云南石龙坝水电站,是中国人自己建设的第一座水电站,它的建设是在受到西方侵略,地方实业救国思想影响下,云南地方各界敢为人先,艰苦奋斗,历经万难建设而成的。是受元初赛典赤治滇以来重视水利的文化传统使然。它产生了重要的影响,促进了中国水电事业的发展,也培养和训练了诸多的水电人才,名垂青史,其水电文化精神是中华民族宝贵的文化遗产。Built in 1910, Shilongba hydroelectric station in Yunnan is the first hydroelectric power station built completely by Chinese themselves. It was built when China was aggressed by western powers. Its construction was completed through the arduous efforts of people from all walks of life in Yunnan, with the appealing idea of saving the nation with local enterprises. The construction was influenced by the cultural tradition of attaching importance to water conservancy since the Sai Dianchi'governing of Yunnan in early Yuan Dynasty. Its construction accelerated the development of China's hydropower and facilitated the cultivation and training of personnel in the industry. Its' spirit is a valueless cultural heritage for the Chinese nation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249