白山抽水蓄能电站地下厂房渗漏的原因分析与治理  被引量:3

Baishan Pumped Storage Reason Analysis and Treatment of Leakage of Underground Powerhouse

在线阅读下载全文

作  者:吴希深 

机构地区:[1]白山发电厂,吉林省桦甸市132400

出  处:《水电自动化与大坝监测》2014年第3期67-70,共4页HYDROPOWER AUTOMATION AND DAM MONITORING

摘  要:白山抽水蓄能电站地下厂房是水工、机械、电气等方面的综合体,集中了绝大部分机电设备,但因地质条件及施工疏忽等原因,致使交通洞底板、水轮机层以下局部渗水,经过渗漏水导排和化灌材料堵漏等多种方法的灵活运用,防渗效果良好。针对不同类型的渗漏所采取的治理方法和使用的材料进行了综合分析和总结。Baishan Pumped Storage Hydropower Station is a complex of hydraulic,mechanical,electrical and other aspects,concentrated most of electrical and mechanical equipment,but due to the geological condition and the construction of negligence and other reasons,led to a traffic bottom hole,turbine following local infiltration,through the flexible use of leakage of water drainage and irrigation material plugging and other methods good anti-seepage effect.To be taken against leakage of different types of control methods and materials used to conduct a comprehensive analysis and summary.

关 键 词:渗漏治理 灌浆 导排 地下厂房 

分 类 号:TV734[水利工程—水利水电工程] TV698.1

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象