Estimation of reservoir and remaining oil prediction based on flow unit analysis  被引量:4

Estimation of reservoir and remaining oil prediction based on flow unit analysis

在线阅读下载全文

作  者:YIN TaiJu1,ZHANG ChangMin1,ZHANG ShangFeng1,WANG ShouPing2 & MAO LiHua2 1 Key Laboratory of Exploration Technologies for Oil and Gas Resources,Ministry of Education,Yangtze University,Jingzhou 434023,China 2 Zhongyuan Oilfield of China Petroleum & Chemical Corporation,Puyang 457001,China 

出  处:《Science China Earth Sciences》2009年第S1期120-127,共8页中国科学(地球科学英文版)

基  金:Supported by the National Natural Science Foundation of China (Grant Nos. 40602013, 40572078);the Ph.D. Programs Foundation of Ministry of Education of China (Grant No. 20060489002)

摘  要:Through natural partition and clustering analysis,four kinds of flow units were distinguished in Pu53 block,Pucheng Oilfield. Taking the short-term cycle as studying unit,the two-dimensional distribution of each type of flow units was forecasted and the short-term cycle was classified into four types based on the two-dimensional characteristics of the flow units. The remaining oil was predicted by conceptual simulation,qualitative analysis and quantitative modeling. The results showed obvious control of the characteristics of reservoir flow units to the remaining oil. E and G units in type I and type II short-term cycles which are distributed continuously in large areas are mostly flooded,while the uncontrolled small isolated G flow unit in type III short-term cycles which were mainly made of F flow unit and F flow unit with continuous distribution become the accumulating place for remaining oil. Thus the development adjustment strategy should optimize the development of small-scale E and G units,strengthen the development of type III short-term cycles,and block out type I short-term cycles. This strategy improves the development of Pu53 block obviously.Through natural partition and clustering analysis,four kinds of flow units were distinguished in Pu53 block,Pucheng Oilfield. Taking the short-term cycle as studying unit,the two-dimensional distribution of each type of flow units was forecasted and the short-term cycle was classified into four types based on the two-dimensional characteristics of the flow units. The remaining oil was predicted by conceptual simulation,qualitative analysis and quantitative modeling. The results showed obvious control of the characteristics of reservoir flow units to the remaining oil. E and G units in type I and type II short-term cycles which are distributed continuously in large areas are mostly flooded,while the uncontrolled small isolated G flow unit in type III short-term cycles which were mainly made of F flow unit and F flow unit with continuous distribution become the accumulating place for remaining oil. Thus the development adjustment strategy should optimize the development of small-scale E and G units,strengthen the development of type III short-term cycles,and block out type I short-term cycles. This strategy improves the development of Pu53 block obviously.

关 键 词:flow unit classification RESERVOIR evaluation RESERVOIR FORECAST REMAINING OIL development RESPONSE adjustment PROJECT 

分 类 号:P618.13[天文地球—矿床学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象