Simulation of influence of multi-defects on long-term working performance of high arch dam  被引量:17

Simulation of influence of multi-defects on long-term working performance of high arch dam

在线阅读下载全文

作  者:ZHANG GuoXin ,LIU Yi,ZHENG CuiYing & FENG Fan State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin,Beijing 100038,China China Institute of Water Resources and Hydropower Research,Beijing 100038,China 

出  处:《Science China(Technological Sciences)》2011年第S1期1-8,共8页中国科学(技术科学英文版)

基  金:supported by the National Key Technology R&D Program (Grant No.2008BAB29B05);the National Natural Science Foundation of China(Grant No.50909105);the Public Industry Research Special Funds of MWR(Grant No.200801007);the Research Special Funds of IWHR

摘  要:As an integrated structure,an arch dam is assumed to bear loads in its design consideration.However,multi-defects,such as cracks and the opening of transverse joints,are unavoidable during construction and operation.Multi-defects will reduce the structural integrity and stiffness of the dam and affect its working performance and degree of safety.In the current paper,a numerical model of defects and a simulation method of a high arch dam are introduced.The Chencun arch dam is analyzed as a case study.An entire course simulation analysis of the Chencun arch dam from construction to operation is carried out,through which the opening of the transverse and longitudinal joints,formation of cracks,and their influence on deformation and stress of the dam are studied.According to the results of the analysis,appropriate measures should be adopted to prevent the development of cracks,and observation should be strengthened for a more timely discovery of risks.As an integrated structure,an arch dam is assumed to bear loads in its design consideration.However,multi-defects,such as cracks and the opening of transverse joints,are unavoidable during construction and operation.Multi-defects will reduce the structural integrity and stiffness of the dam and affect its working performance and degree of safety.In the current paper,a numerical model of defects and a simulation method of a high arch dam are introduced.The Chencun arch dam is analyzed as a case study.An entire course simulation analysis of the Chencun arch dam from construction to operation is carried out,through which the opening of the transverse and longitudinal joints,formation of cracks,and their influence on deformation and stress of the dam are studied.According to the results of the analysis,appropriate measures should be adopted to prevent the development of cracks,and observation should be strengthened for a more timely discovery of risks.

关 键 词:high ARCH DAM CRACK multi-defects working performance 

分 类 号:TV698.11[水利工程—水利水电工程] TV642.4

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象