检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:ZHANG GuoXin ,LIU Yi,ZHENG CuiYing & FENG Fan State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin,Beijing 100038,China China Institute of Water Resources and Hydropower Research,Beijing 100038,China
出 处:《Science China(Technological Sciences)》2011年第S1期1-8,共8页中国科学(技术科学英文版)
基 金:supported by the National Key Technology R&D Program (Grant No.2008BAB29B05);the National Natural Science Foundation of China(Grant No.50909105);the Public Industry Research Special Funds of MWR(Grant No.200801007);the Research Special Funds of IWHR
摘 要:As an integrated structure,an arch dam is assumed to bear loads in its design consideration.However,multi-defects,such as cracks and the opening of transverse joints,are unavoidable during construction and operation.Multi-defects will reduce the structural integrity and stiffness of the dam and affect its working performance and degree of safety.In the current paper,a numerical model of defects and a simulation method of a high arch dam are introduced.The Chencun arch dam is analyzed as a case study.An entire course simulation analysis of the Chencun arch dam from construction to operation is carried out,through which the opening of the transverse and longitudinal joints,formation of cracks,and their influence on deformation and stress of the dam are studied.According to the results of the analysis,appropriate measures should be adopted to prevent the development of cracks,and observation should be strengthened for a more timely discovery of risks.As an integrated structure,an arch dam is assumed to bear loads in its design consideration.However,multi-defects,such as cracks and the opening of transverse joints,are unavoidable during construction and operation.Multi-defects will reduce the structural integrity and stiffness of the dam and affect its working performance and degree of safety.In the current paper,a numerical model of defects and a simulation method of a high arch dam are introduced.The Chencun arch dam is analyzed as a case study.An entire course simulation analysis of the Chencun arch dam from construction to operation is carried out,through which the opening of the transverse and longitudinal joints,formation of cracks,and their influence on deformation and stress of the dam are studied.According to the results of the analysis,appropriate measures should be adopted to prevent the development of cracks,and observation should be strengthened for a more timely discovery of risks.
关 键 词:high ARCH DAM CRACK multi-defects working performance
分 类 号:TV698.11[水利工程—水利水电工程] TV642.4
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.233