检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Zhang Yu, Du Chenggang, Guo Ruimin Shanghai Municipal Electric Power Company
出 处:《Electricity》2010年第4期33-36,共4页电气(英文版)
摘 要:Energy storage system plays an important role in smart grid. Analyzing from the view of existing status and problems facing Shanghai grid, the article puts forward the necessity of applying energy storage technology in a large urban grid and the achievements in the key technologies in Shanghai grid. As a comprehensive demonstration base for the pilot project of smart grid in Expo 2010 by the State Grid, the Shanghai Caoxi Energy Conversion Comprehensive Exhibit Station is also introduced in detail.Energy storage system plays an important role in smart grid. Analyzing from the view of existing status and problems facing Shanghai grid, the article puts forward the necessity of applying energy storage technology in a large urban grid and the achievements in the key technologies in Shanghai grid. As a comprehensive demonstration base for the pilot project of smart grid in Expo 2010 by the State Grid, the Shanghai Caoxi Energy Conversion Comprehensive Exhibit Station is also introduced in detail.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.170.100