检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]燕山大学,河北秦皇岛066004
出 处:《电气技术》2010年第7期66-68,共3页Electrical Engineering
摘 要:本文就AGC功能在大唐鲁北发电厂330MW机组上的运用展开分析讨论,通过试验检验该机组负荷响应能力,保证机组在AGC功能试验过程中的最小变负荷速率、负荷响应的统计偏差和最大偏差满足要求。同时检验了该机组协调控制系统(CCS)的调节品质,保证机组在AGC功能试验过程中的主蒸汽压力、分离器出口过热度、主蒸汽温度、再热汽温度的统计偏差和最大偏差不超标。This paper discusses and analyzes AGC function applying in 330MW unit of Datang Lubei power plant, it examines the unit’s load response capability through this test, meanwhile, it makes the minimum changing load rate , the statistical deviation and maximum deviation of load response meet the requirements in the process of AGC function test. At the same time, the test examines the regulating quality of the unit’s coordinated control system (CCS), it does not make the statistical deviation and maximum deviation of the main steam pressure, the outlet superheat temperature of separator, the main steam temperature and reheat steam temperature exceed.
分 类 号:TM621.3[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145