检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京理工大学,北京100081 [2]浙江工业大学建筑规划设计研究院,浙江杭州310014 [3]上海宝冶建设建筑分公司,上海200941
出 处:《施工技术》2009年第S2期414-417,共4页Construction Technology
摘 要:施工期发生的扣件式钢管模板支撑体系整体倒塌事故一个重要的原因是动态施工荷载作用下高支撑体系整体动力特征认识不足。本文通过一个工程的高支撑体系的现场整体动态检测试验,研究混凝土浇筑过程泵管的水平周期性冲击作用、混凝土振捣棒的振动作用和浇筑路线选择等因素对支模架体系整体振动频率、竖向振幅与水平向振幅、立杆的水平向振动特征的影响,并揭示混凝土振捣棒对支模体系的影响范围和大小。An important reason for the overall collapse accident of high strut of fastener-style steel pipe scaffold system during construction period is the insufficient understanding of over all characteristics of high form strut system under the dynamic working load.Based on the over all dynamic and on-site detection experiment of high form strut system,this article studies about the following elements that the level periodicity shock effect of pump pipe,the vibration effect of vibrated rods and pouring line during concrete construction in what extent affect the the overall vibration,vertical amplitude and horizontal amplitude,vertical pole of the level of the vibration characteristics of moldbase support system.Finally,it reveals how much vibrated rods influences formwork support and the interaction of dynamic axial force and the static axial force of the formwork support.
关 键 词:扣件式钢管架 模板高支撑体系 振动频率 动态检测
分 类 号:TU731.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.151.179