检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河北省水利工程局第一工程处,河北保定071051
出 处:《施工技术》2009年第S1期553-555,共3页Construction Technology
摘 要:南水北调渠道衬砌在初冬季节施工,因华北地区气温逐渐降低,混凝土的凝结时间明显延长,渠底混凝土面板的收面工序施工效率降低,通过采用真空吸水施工工艺,提高早期强度,使混凝土的凝结时间缩短,提高施工效率,缩短收面及养护时间,同时提高混凝土的密实度,降低水灰比。The canal lining for South-to-North Transfers was constructed in the early winter season.Because of the temperature lowers gradually in the north of China,setting time of concrete obviously prolongs,constrcution efficiency of canal bottom concrete is lowered.When vacuum absorbing water construction technique is adopted,earlier strength of concrete is improved,which can shorten setting time and curing time of concrete,raise construction efficiency as well improve compactness of concrete and reduce water-cement ratio.
分 类 号:TV554.14[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7