检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张淮湧[1] 王奇[1] 王树乐[1] 朱炳寅[1] 刘巍[1] 何相宇[1] 席志刚[1] 曹清[1]
出 处:《建筑结构》2009年第S1期211-214,共4页Building Structure
摘 要:工程为建在高寒地区的超长结构,总长度约450m,且结构局部外露,设计中通过技术措施解决此问题;由于建筑要求,博物馆有三个倾斜的剪力墙作为主要竖向受力构件,设计时采用ETABS对结构进行整体分析。The project is a super long structure located in the high-cold area of which the total length is about 450m and part of it is exposed outside.A series of difficulties were accounted for by applying various technical measures during the design.Three leaning shear walls act as the main vertical-bearing member in the museum subject to the architectural request.ETABS software is employed to make the global analysis during the design.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229