检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐琳[1] 高银鹰[1] 张建宇[1] 余蕾[1] 霍文营[1] 张仕通[1]
出 处:《建筑结构》2009年第S1期299-301,共3页Building Structure
摘 要:神舟科技大厦地上16层,为L形不规则平面,设计对结构方案比较分析后,未对结构分缝,采取设计措施减小结构扭转效应和超长温度效应对结构带来的不利影响。本工程业主对施工工期要求非常紧张,设计充分为业主着想,不断优化结构设计,选择适合的结构体系、基础型式、楼盖方案等,使结构设计在满足结构规范要求的同时又很好地满足了建筑功能和施工进度要求。The structure of the Shenzhou Building spans sixteen stories above the ground level,with an L - shaped irregular plane.After thoroughly comparing the possible structural designs,instead of structural jointing,we adopted the structural designs to reduce the impact of the construction torsion effect and temperature effect.Although the project was under a tight schedule,we continuously improved and optimized the structural design,and chose the best structural and foundation types,and floor system.The structural design of the Shenzhou Building not only complied with the structural standard, satisfied the functionality needs,but also fitted into the tight project schedule.Finally,the design has fulfilled the owner' s expectation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229