检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:卫鹏华[1]
机构地区:[1]中铁隧道集团三处有限公司,广东深圳518051
出 处:《隧道建设》2009年第S2期104-107,共4页Tunnel Construction
摘 要:结合厦深铁路大南山隧道1#、2#斜井的施工经验,以大南山隧道1#斜井为例,总结分析影响斜井快速施工的因素及解决办法,阐述斜井快速施工的合理组织形式及现场管理经验、无轨运输施工机械设备的选型与配置原则、配置方案及组合计算方法等。结合施工经验,提出了隧道机械化施工的注意事项和施工相关方的配合与协作等问题,可为类似斜井快速施工机械配套和组织提供借鉴。Based on the construction experience of No.1 and No.2 inclined shafts of Dananshan tunnel on Xiamen-Shenzhen railway,the author,taking No.1 inclined shaft of Dananshan tunnel as an example,analyzes the factors that have influence on the rapid construction of inclined shafts and summarizes the countermeasures.The author expounds on the reasonable organization forms,site management experience and type selection,matching principle,matching plan and matching calculation method of construction machinery under the condition of trackless transportation system.Finally,the author makes some comments on the mechanical tunneling and cooperation among the related parties.This paper can provide reference for the machinery matching and construction organization of similar inclined shafts in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38