检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张海力[1] 张存华[1] 陈辉[1] 高百东[1] 张明瑾[1]
出 处:《石油工程建设》2009年第S2期23-25,8,共4页Petroleum Engineering Construction
摘 要:EPC施工部担负兰银管道的技术管理职责,做好新技术管理模式下的技术管理工作是工程质量、进度、经济效益的可靠保证。文章结合工程实际,论述了工程技术管理的分级模式及从方案的起草到实施的全过程,多角度分析了技术文件现场实施的影响因素和控制点,以及如何对技术的现场实施过程进行监督,保证技术方案的严格落实等。The technical management responsibility of Lan-Yin Pipeline Project was taken on by the EPC Construction Department,which was essential to guarantee the project quality,schedule and economic benefit.Based on the engineering practice,this paper discusses the hierarchical management mode and the whole process from drawing out plan to implementation,analyzes the influence factors affecting field implementation of technical files and key control points from multi perspectives,and indicates how to carry out supervising and ensure putting technical plan into effect.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145