检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海海事大学海洋环境与工程学院,上海200135 [2]同济大学地下建筑与工程系,上海200092
出 处:《工业建筑》2009年第S1期797-799,812,共4页Industrial Construction
基 金:海市教委预算支出项目资助(2008076);上海高校选拔培养优秀青年教师科研专项基金(shs08004)
摘 要:结合上海市某大型集装箱码头建设项目,对大面积荷载作用下港区堆场的软土地基沉降进行动态监测,针对实测沉降-时间关系曲线的变化特点,引入双曲线模型对地基沉降进行非线性回归分析。通过预测值与实测值的对比分析证明双曲线模型的可靠性,在此基础上对地基最终沉降作出了预测,为港区的安全运营提供了指导。Based on a harbor construction project in Shanghai,the post-construction ground settlement induced by large-area load is timely monitored.According to the shape of measured settlement-time curves,the hyperbolic model is used to fit the settlement data.The results of the comparison of ground settlement between predicted values and measured values verify the feasibility of hyperbolic model, and the final settlement of the ground is also predicted by hyperbolic model.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28