检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:盛勇[1] 李桂方 李飞[1] 黎强[1] 任自伟[1]
机构地区:[1]塔里木油田公司开发事业部,新疆库尔勒841000
出 处:《石油钻采工艺》2009年第S2期27-28,31,共3页Oil Drilling & Production Technology
摘 要:塔里木轮南侏罗三叠系油藏经多年开发后,压力降低,成为低压渗透层,压力系数1.15~1.18,钻井液密度超过1.2 g/cm^3就会出现渗漏。完井技术套管裸眼段长,套管串与井壁间环空间隙小,循环阻力大,水泥浆密度高(平均在1.85~1.90 g/cm^3),液柱压力大,固井施工泵压高,致使水泥浆在低压渗透的储集层段漏失,从而影响了固井质量,污染了油层,给完井后井下作业造成极大的难度。因此决定在国内率先采用三级固井技术试验并获得成功。After many years of production,Jurassic-Triassic reservoir in Lunnan of Tarimu becomes a low permeability layer with a pressure coefficient of 1.15-1.18.Leakage will happen once the drilling fluid density is more than 1.20 g/cm^3.Because of problems such as long open hole completion casing length,small gap between casing string and hole wall,large circulation resistance,high slurry density(1.85-1.90 g/cm^3 in average),big liquid column pressure,high cementing pump pressure, leakage is easy to happen in low pressure section,which affects the cementing quality,pollutes the reservoir and leaves a great difficulty to downhole operation after the completion.Therefore,the development industry became the first domestic in using triple cementing technique and achieved success.
分 类 号:TE256.6[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28