检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《电气技术》2009年第4期58-60,71,共4页Electrical Engineering
摘 要:由于配电网点多面广,采用GPS及光纤网络不仅投资大、而且在市政保护、光纤的全面铺设等存在诸多问题。鉴于此,本文提出了一种利用PLC组建配电网时间同步网络的方案,该方案以广播式和请求式相结合的方法,通过解算出网络时间延迟τ,从而得到高精度的配电网系统时间。该方案区别于传统的通信网络模式,不仅组网方便,还可大大降低购置成本。As more extensive distribution network, the use of GPS and optical fiber and cable networks not only need large investment, but also in municipal protection, the full cable-laying, and so there are many problems. This paper presents a distribution network set up by PLC network time synchronization of the programme. The programme to broadcast on-demand and a combination of methods, calculated through the network of the time delay, so as to get high-precision time distribution network system. The programme is different from the traditional mode of communication networks, that network not only convenient, but also can greatly reduce the purchase cost.
分 类 号:TM76[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112