检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Hitoshi FURUTA Ken ISHIBASHI Koichiro NAKATSU Shun HOTTA
机构地区:[1]Department of Informatics, Kansai University [2]Graduate School of Informatics, Kansai University
出 处:《Tsinghua Science and Technology》2008年第S1期400-405,共6页清华大学学报(自然科学版(英文版)
摘 要:The purpose of this research is to propose an early restoration for lifeline systems after earthquake disasters. The previous researches show that the optimization of the restoration schedule by using genetic algorithm (GA) is powerful. However, those are not considering the uncertain environment after earthquake disasters. The circumstances of the damage at devastated areas are very changeable due to the aftershock, fire disaster and bad weather. In addition, the restoring works may delay by unexpected accidents. Therefore, it is necessary to obtain the restoration schedule which has robustness, because the actual restoring works could not progress smoothly under the uncertain environment. GA considering uncertainty (GACU) can treat various uncertainties involved, but it is difficult to obtain the robust schedule. In this study, an attempt is made to develop a decision support system of the optimal restoration scheduling by using the improved GACU.The purpose of this research is to propose an early restoration for lifeline systems after earthquake disasters. The previous researches show that the optimization of the restoration schedule by using genetic algorithm (GA) is powerful. However, those are not considering the uncertain environment after earthquake disasters. The circumstances of the damage at devastated areas are very changeable due to the aftershock, fire disaster and bad weather. In addition, the restoring works may delay by unexpected accidents. Therefore, it is necessary to obtain the restoration schedule which has robustness, because the actual restoring works could not progress smoothly under the uncertain environment. GA considering uncertainty (GACU) can treat various uncertainties involved, but it is difficult to obtain the robust schedule. In this study, an attempt is made to develop a decision support system of the optimal restoration scheduling by using the improved GACU.
关 键 词:restoration schedule genetic algorithm UNCERTAINTY delay of schedule
分 类 号:TP399-C3[自动化与计算机技术—计算机应用技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.92.14