广东核电站港内泊稳条件数值计算  

NUMERICAL CALCULATION FOR THE STABLENESS IN.THE HARBOUR BASIN OF GUANGDONG NUCLEAR PLANT

在线阅读下载全文

作  者:张长宽[1] 龚崇准[1] 顾家龙[1] 

机构地区:[1]河海大学

出  处:《海洋工程》1992年第1期35-48,共14页The Ocean Engineering

摘  要:广东核电站位于大亚湾,防波堤口门处台风期设计波高H_(1/10)达6.7m,而泵房前进水口允许波高H_(1/3)仅0.3m。为此,在进水口前布置了东、西导堤加以掩护,形成二次绕射,以满足进水口的泊稳要求,同时,港内边界由全反射的重力式码头和部分反射的斜坡式防波堤、导堤及护岸等组成。所以,本文建立了具有任意反射率复杂边界的多港湾波浪绕射的数学模型。数值计算结果与相同条件下的物理模型试验结果吻合良好。The harbour of Guangdong Nuclear Plant is situated at Daya Bay. The design wave height(H 1/10 )at the entrance of the harbour is about 6.7m in typhoon period,and the permissible wave height (H 1/a ) in front of the pump station should be lessthan 0. 3m. Therefore, in order to meet this requirement the water intake should be further protected by tow jetties (the western and eastern jetties) to form an inner intake basin, in which the sub-diffraction waves are generated.Thus, in estimating the wave agitation in harbour basins,different kinds of boundaries with different reflection coefficients should be taken into consideration,including full reflection for gravity type quay and partial reflection for rubble mound breakwater,shore wall and jetties. A mathematical model for wave diffraction in a multi-basin area with arbitrary reflective boundaries is presented in this paper. The agreement between the results of mathematical model and the results obtained by the physical model is favourable.

关 键 词:设计波高 防波堤口门 风期 进水口 斜坡式防波堤 波浪绕射 波向线 重力式码头 导堤 波浪要素 

分 类 号:P75[天文地球—海洋科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象